Scenarios06 / 37

Automatic production data: machine output and downtime turned into a daily report

Output and downtime are still written down by a shift leader walking round every so often. Collect the machine data automatically instead: output, uptime and downtime are tallied in real time, and the daily line report produces itself.

These are examples of systems we can build for you. They describe what is possible and are not completed client projects.

Illustration based on common needsA daily line report: output, uptime and downtime for the day, with an hourly output chart where the low hour is highlighted.This screen illustrates the approach. It is not a client’s actual system, and every name and number on it is made up. The real fields and steps are planned around how you work.
01

What we often hear

  • "Output is noted by the shift leader, so times and numbers are rough."
  • "Nobody can say afterwards how long a machine stopped, or why."
  • "Managers wait until the next day for the report."
  • "We'd like to know which machine causes most trouble, but there's no data."
023 items

How it can work

  1. First, find how to get data from each machine

    Machines of different ages expose data differently: some via the PLC, some over a network interface, and some only through an added counter sensor. We check each machine before choosing a method, and start with one.

  2. Output and downtime recorded automatically

    Once data flows in, output, uptime and downtime are tallied by time period. When a machine stops, staff can pick a reason on a tablet, so the most common causes become visible.

  3. Daily reports produced automatically, with alerts

    The daily line report is ready for managers to open, and the person in charge can be alerted when output drops sharply or a stop runs too long.

035 items

Questions

Our machines are old. Can data still be collected?

Usually, yes. Even without a data port, a sensor can count parts or detect whether the machine is running.

Will this affect how the machines run?

Data collection is read-only; the machine control programs are not changed.

Do all machines have to be done at once?

No. Start with one machine or line and expand once the data is right.

Can it connect to work orders or scheduling?

Yes. Linking output to work orders shows how long each order actually took and on which machine.

How long is data kept?

As you need; summaries are usually kept for years, and raw detail can be archived periodically.

Would you like to talk through how you do this today?

No specification needed.
Tell us which part of your work takes the most time, and we will look at the right approach together.

See all 37 scenarios